12 July 2018

Inglenook micro layout – Märklin C Gleis/Tracks - Wednesday & Thursday 11/12 July 2018

Two other good evenings of work.

Construction of the layout is going well, so it was now time to build a staging yard.  I used (or recycled) another IVAR side unit for the base frame.  My goal is to have a decent size yard, not too heavy, that can be used with my other layouts (which are also under construction).  I attached 1/2 plywood to the IVAR frame.  I took the time to remove the center part of the board to reduce the weight.  The sides are made out of MDF.  I still need to glue foam board on the plywood sheets.

Photo 24 to 27:







No comments:

Post a Comment